Modernization of lighting in the Keller Polska production plant
About company
The company Greenie Polska this time received an order from a very well-known and respected company from the geotechnical services industry, whose roots date back to the 19th century – namely Keller. The Polish branch of this company decided to invest in new lighting for its warehouse, located in Ożarów Mazowiecki, which, next to Błonie and Pruszków, is the logistics base for the capital.
Better work conditions
The facility where the lighting was modernized consisted of a service hall measuring 37.7 m by 19.1 m, a high warehouse: 15.10 m by 13.10 m and a warehouse on the mezzanine: 15.10 m by 6 meters. It was found on the spot that the installation of the new lighting required a partial replacement of the electrical system to accommodate modern lamps.
At the beginning, in accordance with the standards, an audit of the work of the existing lighting was carried out and simulated in CAD and Dialux. The aim was to simulate the functioning of current and future lighting. This allowed to show all the elements that needed improvement in the existing lighting system, which could be corrected with the installation of the new Greenie LED lighting. One of the factors taken into account when implementing Dialux projects were the technical requirements for the appropriate amount of lux in specific rooms.